New Launch - India Real Estate Report 2026.

GSR Heights

GSR Builders & Developers (P) Ltd

--Select--, Uttar Pradesh

RERA approved

Approved

1st Oct 2023

Completion pending

Pending

26th Jan 2027

Registration No.

UPRERAPRJ140409

Project Type

Residential

District

--Select--

Taluka

Select

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ140409
Project StatusNew
Project CategoryResidential
District--Select--
TalukaSelect
Start Date2023-10-01
Completion Date2027-01-26
Total Area (sqm)6013
Project Cost (Lacs)4670
Duration (Months)40
Registration Fee35500

Promoter Details

Promoter NameGSR Builders & Developers (P) Ltd
Promoter IDUPRERAPRM19423
Mobile78********

Project Team

rolename
ArchitectSunil Kumar Srivastava
ContractorRaj Constructions
Structural EngineerNaveen Kumar Singh

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra2571506
Khasra25743410
Khasra25801140
Khasra27821012

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
A11 BHK136-
A12 BHK149-
A12 BHK149-
A21 BHK136-
A23 BHK192-
A22 BHK149-
A22 BHK149-
A31 BHK136-
A33 BHK192-
A32 BHK149-
A32 BHK149-
A41 BHK136-
A43 BHK192-
A13 BHK192-
A42 BHK149-
A42 BHK149-
A51 BHK136-
A53 BHK192-
A52 BHK149-
A52 BHK149-
A61 BHK136-
A63 BHK192-
A62 BHK149-
A62 BHK149-
A71 BHK136-
A73 BHK192-
A72 BHK149-
A72 BHK149-
A81 BHK136-
A83 BHK192-
A82 BHK149-
A82 BHK149-
A91 BHK136-
A93 BHK192-
A92 BHK149-
A92 BHK149-
A101 BHK136-
A103 BHK192-
A102 BHK149-
A102 BHK149-
B13 BHK2101-
B12 BHK164-
B12 BHK263-
B12 BHK149-
B11 BHK123-
B11 BHK122-
B23 BHK2101-
B22 BHK164-
B22 BHK263-
B22 BHK149-
B21 BHK123-
B21 BHK122-
B33 BHK2101-
B32 BHK164-
B32 BHK263-
B32 BHK149-
B31 BHK123-
B31 BHK122-
B43 BHK2101-
B42 BHK163-
B42 BHK263-
B42 BHK149-
B41 BHK123-
B41 BHK122-
B53 BHK2101-
B52 BHK164-
B52 BHK263-
B52 BHK149-
B51 BHK123-
B51 BHK122-
B63 BHK2101-
B62 BHK163-
B62 BHK263-
B62 BHK149-
B62 BHK123-
B62 BHK122-
B73 BHK2101-
B72 BHK164-
B72 BHK263-
B72 BHK149-
B71 BHK123-
B71 BHK122-
B83 BHK2101-
B82 BHK164-
B82 BHK263-
B82 BHK149-
B81 BHK123-
B81 BHK122-
B93 BHK2101-
B92 BHK164-
B92 BHK263-
B92 BHK149-
B91 BHK123-
B91 BHK122-
B103 BHK2101-
B102 BHK164-
B102 BHK263-
B102 BHK149-
B101 BHK123-
B101 BHK122-
C12 BHK263-
C12 BHK158-
C12 BHK156-
C12 BHK262-
C22 BHK263-
C22 BHK262-
C22 BHK158-
C22 BHK156-
C32 BHK263-
C32 BHK262-
C32 BHK158-
C32 BHK156-
C42 BHK158-
C42 BHK156-
C42 BHK263-
C42 BHK262-
C52 BHK263-
C52 BHK262-
C52 BHK158-
C52 BHK156-
C62 BHK263-
C62 BHK262-
C62 BHK158-
C62 BHK156-
C72 BHK263-
C72 BHK262-
C72 BHK158-
C72 BHK156-
C82 BHK263-
C82 BHK262-
C82 BHK158-
C82 BHK156-
C92 BHK263-
C92 BHK262-
C102 BHK163-
C102 BHK162-
C102 BHK253-
C102 BHK248-
C92 BHK158-
C92 BHK156-

Development Works

work_namedescription
Demarcation of PlotsBy Chain link Fencing
Boundary Wall2.5 mtr high and 230 mm thick boundary wall along with RCC columns to strengthen it has been proposed to be constructed along with entry and exit gates.
Road Workcomplete CC internal road alongh with paver pathways is proposed to be constructed as per CPWD specification for required load and width. road shall have some patterns using granite pavers at junctions and block entry points.
Footpathsall internal roads to have 0.75 m wide footpath in 40-60 mm thick concrete/ granite pavers or equivalent finishes.
Water Supply Including Drinking Water Facilitiesunderground water to be supplied through terrace tank.
Sewer Systemcentralized sewerage system as per design shall be provided. all sewerage disposal shall be go to the STP for the treatment and treated water shall be used for gardening and building and external road washing.
DrainStorm water system as per design shall be provided ,. Storm water from terrace tops, roads and other landscaped area shall be connected to the storm water drain channel and go to the rain water harvesting pits to recharge the ground water.
ParksHighly enriched green parks with grass cover and plantation / shrubs have been proposed in our approved plan
Tree Plantingthere are five types of trees proposed at site which are Kuchnar, gulmohar, phycus, kusum and neem.
Design For Electric Supply Including Street LightingA well designed electricity distribution system as per norms o electricity board will be in place along with centralised transformer , HT panel, LT panel, feeder pillar , DG for common service like
Community Buildingsbasic recreational facility like Gym, common room and library.
Treatment and Disposal System of Sewage and Sullage watercentralised sewerage system shall be provided , all sewerage disposal shall be go to the STP for treatment and after treatment water shall be used for gardening washing and flushing system.
Solid Waste Management And Disposal Systemproper garbage disposal / collection point has been proposed. Nagar NIgam to collect garbage from this point.
Water Conservation SystemA well designed RWH System is proposed
Energy Management System Including Use of Renewable Energywe will used LED light fitting in external and common areas as well as 20 percent Solar street lights , in STP and pump room all the equipment shall have energy efficient motors system and pumps.
Fire Protection And Fire Safety Systemas per approved drawing by Fire department.
Social Infrastructure And Other Public Amenities Including Public Health ServicesYes
Emergency Evacuation Servicesexits and from each end every point has been planned and proposed As per NBC norms
Other Miscellaneous WorkNA

Bank Details

Bank NameCentral Bank of India
BranchAlambagh
Branch AddressTalkatora Road
Account HolderGSR Builders and Developers Pvt Ltd, RERA Collection Account for GSR Heights
Account Number5354765846
IFSC CodeCBIN0280140

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy