Project Details

RERA IDUPRERAPRJ388810
Project StatusCompleted
Project CategoryResidential
DistrictShahjahanpur
TalukaShahjahanpur
Start Date2019-03-01
Completion Date2023-12-17
Total Area (sqm)78137
Project Cost (Lacs)9353
Duration (Months)58
Registration Fee396000

Promoter Details

Promoter NameSun Developers
Promoter IDUPRERAPRM75589
Mobile88********

Project Team

rolename
ArchitectAnupum Saxena
Contractornil
Structural EngineerBRAJPAL SINGH

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra813970
Khasra871050
Khasra881340
Khasra901160
Khasra911920
Khasra922590
Khasra93440
Khasra941340
Khasra966480
Khasra97770
Khasra98730
Khasra102160
Khasra3043800
Khasra3081420
Khasra309970
Khasra3102590
Khasra3114370
Khasra3295220
Khasra3301420
Khasra331480
Khasra332520
Khasra333450
Khasra334450
Khasra3374900
Khasra3381380
Khasra3121315
Khasra3131315
Khasra100 (P)1160
Khasra101 (P)160
Khasra303/2140
Khasra328 (P)2690
Khasra335 (P)3160
Khasra336 (P)1820
Khasra340/41090
Khasra340/5 (P)6310
Khasra80/3782310
Khasra86 (P)4010
Khasra99 (P)1330
Khasra891160

Development Works

work_namedescription
Demarcation of PlotsThe entire plot is surrounded by boudary will having total 1 no. of entry gate and 1no. of exit gate from the 12m wide front road.
Boundary Wall3.0-3.5m high and 225 mm thick Boundary wall designed . Brick Work of 9inches and rcc work in column and beam has been used as per design. MS Broad entrance and exit gates are developed with boundary.
Road WorkHigh quality concrete pavers will be used as per deisgn suggeseted by the Architechts for internal road.
FootpathsAll internal roads will have 0.75m wide footpath in 100 mm thick concrete cross pavers or equivalent finishes.
Water Supply Including Drinking Water FacilitiesOur overhead Town of 3,50,000 ltr. Capacity shall be provided. Also end user shall be use their individual RO system as per their requirement. Overhead tanks shall be provided on building terrace for distribution through gravity.
Sewer SystemCentralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening and oveflow from the STP shall be connect with the Municiple sewarage system.
DrainStorm water system shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain line.
ParksThere are seven parks with play area for childrens and different recretional activities. Facility of Open Gym will be provided as per Architecht designs.
Tree Planting5 types of trees shall be provided as per landscape design.
Design For Electric Supply Including Street LightingWe have design the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar.
Community BuildingsNA
Treatment and Disposal System of Sewage and Sullage waterCentralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening and oveflow from the STP shall be connect with the Municiple sewarage system.
Solid Waste Management And Disposal SystemThere is a proper garbage collection area provided for the solid waste management.
Water Conservation SystemA well designed rain water harvesting system shall be provided in the project.
Energy Management System Including Use of Renewable EnergyWe will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor.
Fire Protection And Fire Safety SystemSince all the buildings are less than 10m in height all the fire norms shall be followed as NBC and approval of fire department.
Social Infrastructure And Other Public Amenities Including Public Health ServicesSTP ,Storm water and water supply system shall be Provided. Transfer pumps to fill the domestic overhead tank. Water for domestic use & Flushing go down through gravity from domestic as well as flushing tanks. All Sewgage shall be go to the STP for recycling the water. Storm water for Roof,Roads and other area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain.
Emergency Evacuation ServicesNA
Other Miscellaneous WorkNA

Bank Details

Bank NameState Bank of India
BranchTown Hall Shahjahanpur
Branch AddressTown Hall Shahjahanpur
Account HolderSun Developers
Account Number38244168261
IFSC CodeSBIN0003085

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy