Harnarain Aeropolis
Dreamland Holdings Ltd.
Varanasi, Uttar Pradesh
Approved
1st Jan 2021
Pending
31st Jul 2026
Registration No.
UPRERAPRJ916732
Project Type
Residential
District
Varanasi
Taluka
Pindra **
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ916732 |
| Project Status | New |
| Project Category | Residential |
| District | Varanasi |
| Taluka | Pindra ** |
| Start Date | 2021-01-01 |
| Completion Date | 2026-07-31 |
| Total Area (sqm) | 8382 |
| Project Cost (Lacs) | 5650 |
| Duration (Months) | 67 |
| Registration Fee | 47000 |
Promoter Details
| Promoter Name | Dreamland Holdings Ltd. |
| Promoter ID | UPRERAPRM66907 |
| Mobile | 91******** |
Project Team
| role | name |
|---|---|
| Architect | Mr. Rajesh Shukla |
| Contractor | Dreamland Holdings Ltd. |
| Structural Engineer | Mr. Sharad Gupta |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Plot | S.M Plot No. 64 and 65, Mauza- sehmallpur, Pargana- Athgawa, Tehsil- Pindra, District- Varanasi, 221006 | 8500 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) |
|---|---|---|---|---|
| Tower-1(T1) | GF | SHOP | 1 | 11.94 |
| Tower-1(T1) | GF | SHOP | 1 | 11.94 |
| Tower-1(T1) | 2 | 4 BHK | 1 | 172.64 |
| Tower-1(T1) | 3 | 4 BHK | 1 | 172.64 |
| Tower-1(T1) | 4 | 4 BHK | 1 | 172.64 |
| Tower-1(T1) | 5 | 4 BHK | 1 | 172.64 |
| Tower-1(T1) | 6 | OTHER | 1 | 338.38 |
| Tower-1(T1) | 7 | OTHER | 0 | 0 |
| Tower-1(T1) | 8 | 4 BHK | 1 | 147.76 |
| Tower-1(T1) | 9 | 4 BHK | 1 | 147.76 |
| Tower-2(T2) | 1 | 3 BHK | 1 | 98.48 |
| Tower-2(T2) | 1 | 3 BHK | 1 | 109.67 |
| Tower-2(T2) | 1 | 2 BHK | 1 | 73.7 |
| Tower-2(T2) | 1 | 2 BHK | 1 | 77.12 |
| Tower-2(T2) | 1 | 3 BHK | 1 | 107.13 |
| Tower-2(T2) | 1 | 3 BHK | 1 | 96.29 |
| Tower-2(T2) | 1 | 2 BHK | 1 | 77.37 |
| Tower-2(T2) | 1 | 3 BHK | 1 | 90 |
| Tower-2(T2) | 2 | 3 BHK | 1 | 98.48 |
| Tower-2(T2) | 2 | 3 BHK | 1 | 109.67 |
| Tower-2(T2) | 2 | 2 BHK | 1 | 73.7 |
| Tower-2(T2) | 2 | 2 BHK | 1 | 77.12 |
| Tower-2(T2) | 2 | 3 BHK | 1 | 107.13 |
| Tower-2(T2) | 2 | 3 BHK | 1 | 96.29 |
| Tower-2(T2) | 2 | 2 BHK | 1 | 77.37 |
| Tower-2(T2) | 2 | 3 BHK | 1 | 90 |
| Tower-2(T2) | 3 | 3 BHK | 1 | 98.48 |
| Tower-2(T2) | 3 | 3 BHK | 1 | 109.67 |
| Tower-2(T2) | 3 | 2 BHK | 1 | 73.7 |
| Tower-2(T2) | 3 | 2 BHK | 1 | 77.12 |
| Tower-2(T2) | 3 | 3 BHK | 1 | 107.13 |
| Tower-2(T2) | 3 | 3 BHK | 1 | 96.29 |
| Tower-2(T2) | 3 | 2 BHK | 1 | 77.37 |
| Tower-2(T2) | 3 | 3 BHK | 1 | 90 |
| Tower-2(T2) | 4 | 3 BHK | 1 | 98.48 |
| Tower-2(T2) | 4 | 3 BHK | 1 | 109.67 |
| Tower-2(T2) | 4 | 2 BHK | 1 | 73.7 |
| Tower-2(T2) | 4 | 2 BHK | 1 | 77.12 |
| Tower-2(T2) | 4 | 3 BHK | 1 | 107.13 |
| Tower-2(T2) | 4 | 3 BHK | 1 | 96.29 |
| Tower-2(T2) | 4 | 2 BHK | 1 | 77.37 |
| Tower-2(T2) | 4 | 3 BHK | 1 | 90 |
| Tower-2(T2) | 5 | 3 BHK | 1 | 98.48 |
| Tower-2(T2) | 5 | 3 BHK | 1 | 109.67 |
| Tower-2(T2) | 5 | 2 BHK | 1 | 73.7 |
| Tower-2(T2) | 5 | 2 BHK | 1 | 77.12 |
| Tower-2(T2) | 5 | 3 BHK | 1 | 107.13 |
| Tower-2(T2) | 5 | 3 BHK | 1 | 96.29 |
| Tower-2(T2) | 5 | 2 BHK | 1 | 77.37 |
| Tower-2(T2) | 5 | 3 BHK | 1 | 90 |
| Tower-2(T2) | 6 | 3 BHK | 1 | 98.48 |
| Tower-2(T2) | 6 | 3 BHK | 1 | 109.67 |
| Tower-2(T2) | 6 | 2 BHK | 1 | 73.7 |
| Tower-2(T2) | 6 | 2 BHK | 1 | 77.12 |
| Tower-2(T2) | 6 | 3 BHK | 1 | 107.13 |
| Tower-2(T2) | 6 | 3 BHK | 1 | 96.29 |
| Tower-2(T2) | 6 | 2 BHK | 1 | 77.37 |
| Tower-2(T2) | 6 | 3 BHK | 1 | 90 |
| Tower-2(T2) | 7 | 3 BHK | 1 | 98.48 |
| Tower-2(T2) | 7 | 3 BHK | 1 | 109.67 |
| Tower-2(T2) | 7 | 2 BHK | 1 | 73.7 |
| Tower-2(T2) | 7 | 2 BHK | 1 | 77.12 |
| Tower-2(T2) | 7 | 3 BHK | 1 | 107.13 |
| Tower-2(T2) | 7 | 2 BHK | 1 | 77.37 |
| Tower-2(T2) | 7 | 3 BHK | 1 | 90 |
| Tower-2(T2) | 8 | 3 BHK | 1 | 98.48 |
| Tower-2(T2) | 8 | 3 BHK | 1 | 109.67 |
| Tower-2(T2) | 8 | 2 BHK | 1 | 73.7 |
| Tower-2(T2) | 8 | 2 BHK | 1 | 77.12 |
| Tower-2(T2) | 8 | 3 BHK | 1 | 107.13 |
| Tower-2(T2) | 8 | 3 BHK | 1 | 96.29 |
| Tower-2(T2) | 8 | 2 BHK | 1 | 77.37 |
| Tower-2(T2) | 8 | 3 BHK | 1 | 90 |
| Tower-2(T2) | 9 | 3 BHK | 1 | 98.48 |
| Tower-2(T2) | 9 | 3 BHK | 1 | 109.67 |
| Tower-2(T2) | 9 | 2 BHK | 1 | 73.7 |
| Tower-2(T2) | 9 | 2 BHK | 1 | 77.12 |
| Tower-2(T2) | 9 | 3 BHK | 1 | 107.13 |
| Tower-2(T2) | 9 | 3 BHK | 1 | 96.29 |
| Tower-2(T2) | 9 | 2 BHK | 1 | 77.37 |
| Tower-2(T2) | 9 | 3 BHK | 1 | 90 |
| Tower-2(T2) | 10 | 3 BHK | 1 | 98.48 |
| Tower-2(T2) | 10 | 3 BHK | 1 | 109.67 |
| Tower-2(T2) | 10 | 2 BHK | 1 | 73.7 |
| Tower-2(T2) | 10 | 2 BHK | 1 | 77.12 |
| Tower-2(T2) | 10 | 3 BHK | 1 | 107.13 |
| Tower-2(T2) | 10 | 3 BHK | 1 | 96.29 |
| Tower-2(T2) | 10 | 2 BHK | 1 | 77.37 |
| Tower-2(T2) | 10 | 3 BHK | 1 | 90 |
| Tower-2(T2) | 11 | 3 BHK | 1 | 98.48 |
| Tower-2(T2) | 11 | 3 BHK | 1 | 109.67 |
| Tower-2(T2) | 11 | 2 BHK | 1 | 73.7 |
| Tower-2(T2) | 11 | 2 BHK | 1 | 77.12 |
| Tower-2(T2) | 11 | 3 BHK | 1 | 107.13 |
| Tower-2(T2) | 11 | 3 BHK | 1 | 96.29 |
| Tower-2(T2) | 11 | 2 BHK | 1 | 77.37 |
| Tower-2(T2) | 11 | 3 BHK | 1 | 90 |
| Tower-2(T2) | 12 | 3 BHK | 1 | 98.48 |
| Tower-2(T2) | 12 | 3 BHK | 1 | 109.67 |
| Tower-2(T2) | 12 | 2 BHK | 1 | 73.7 |
| Tower-2(T2) | 12 | 2 BHK | 1 | 77.12 |
| Tower-2(T2) | 12 | 3 BHK | 1 | 107.13 |
| Tower-2(T2) | 12 | 3 BHK | 1 | 96.29 |
| Tower-2(T2) | 12 | 2 BHK | 1 | 77.37 |
| Tower-2(T2) | 12 | 3 BHK | 1 | 90 |
| Tower-1(T1) | 1 | OTHER | 0 | 0 |
| Tower-2(T2) | 7 | 3 BHK | 1 | 96.29 |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | This is two plots connected in heptagon shaped , having a frontage of 30m with 1 entry and 1 exit gate from a 12m front wide road and a 9m internal roads . Site is bounded as follows ;East - Chak Road , West-Main Road (12m) , North - Nali , South -Others plot. |
| Boundary Wall | 3m high and 225 mm thick Boundary wall designed . RCC work in column and beam will be used as per design. |
| Road Work | Paver/ Trimix based road will be created for all internal road works with concrete pavers at certain junction points. |
| Footpaths | All internal roads will have 1.5m wide footpath on 40-60mm thick concrete pavers or equivalent finishes. |
| Water Supply Including Drinking Water Facilities | Pumps of 225 LPM at 100mtrs. overhead shall be provided with onw working and another on standby. |
| Sewer System | Sewage Treatment Plant (SLD) of 85 KLD Capacity with STP treated water usage in horticulture and one standby |
| Drain | The green area is designed to recharge its rainwater and the hard pavement / road is sloped gently towards the main road where it connects to the main storm water drain along the main road. |
| Parks | Open green area of 1690.47 sq. metres is provided as per the sanction plan . |
| Tree Planting | Lagerstromeia indica (156) , Eugenia (15) , Sweetiana Mahogany (43), Michalia champaca (23) , Lagerstromia flos reginae (10) ,Canocarpus (11), Ficus Lyrata (11) , Buddha belly Bamboo (45) , Raphis Palm (24) , Pandanus bapyistii (25) , ficus safari (20) , Adenium (3) are being provided. |
| Design For Electric Supply Including Street Lighting | Street /landscape lighting shall be provided |
| Community Buildings | Community area is included in Tower-1 (Ground and First Floor respectively as in the sanction map ), which shall be accessible to all residents. |
| Treatment and Disposal System of Sewage and Sullage water | Sewage Treatment Plan (STP) of 85 KLD capacity shall be provided. The treated water shall be used in horticulture , flushing , carwash and excess water shall be discharged into the municipal sewer as per site |
| Solid Waste Management And Disposal System | There are a proper garbage collection area provided for the solid waste management . |
| Water Conservation System | In total 3 Rain Water Harvesting facilities and 2 borewalls shall be provided and sewage water shall be recycled to the extent feasible |
| Energy Management System Including Use of Renewable Energy | Solar panels shall be provided on terrace for renewal energy. Energy purchased from the grid/ power supply company and net metering will be done as per electricity supply authority guideline. |
| Fire Protection And Fire Safety System | Fire Tender path shall be provided as per NBC. Fire Fighting system along with pumps and water storage tanks shall be provided as per NBC and NOC from Fire Department. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Sewerage, Storm water and water supply shall be provided. We have proposed common Pump Room with Primary Filteration , Transfer pumps to fill the domestic overhead tank . Water for domestic use and flushing go down through gravity from domestic as well as flushing tanks . All sewage shall be go the STP for recycling the water. Strom water for roofs, roads and other area shall be connected to the Storm water drain channel and go to the Rainwater harvesting Pit for recharge the groundwater and overflow shall be connected with Municiple Drain |
| Emergency Evacuation Services | Balcony will also be used for evacuation . Assembly points areas will be demarcated for earthquake and other possible disasters |
| Other Miscellaneous Work | 6m high, 12m of front with one entry , one exit gate of 5.5 m each and one 1.2 m gate for two wheeler entry . The gate is attached with a guard room |
Bank Details
| Bank Name | HDFC Bank |
| Branch | Rathyatra Crossing Branch |
| Branch Address | No. 2A, A5 , MS Plaza, Rathyatra Crossing, Varanasi -221010 , Uttar Pradesh |
| Account Holder | DHL SEP BANK AC FOR HARNARAIN AEROPOLIS |
| Account Number | 50200055797436 |
| IFSC Code | HDFC0000220 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Kanpur


Ask Pulse Ai anything about real estate