New Launch - India Real Estate Report 2026.

Raj Residency

Framework Infrabuilds Pvt Ltd

Varanasi, Uttar Pradesh

RERA approved

Approved

14th Oct 2017

Project completed

Completed

28th Jun 2024

Registration No.

UPRERAPRJ7587

Project Type

Residential

District

Varanasi

Taluka

Varanasi

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ7587
Project StatusCompleted
Project CategoryResidential
DistrictVaranasi
TalukaVaranasi
Start Date2017-10-14
Completion Date2024-06-28
Total Area (sqm)4600
Project Cost (Lacs)1148
Duration (Months)81
Registration Fee28000

Promoter Details

Promoter NameFramework Infrabuilds Pvt Ltd
Promoter IDUPRERAPRM15007
Mobile87********

Project Team

rolename
ArchitectRajkumar
ContractorAvinash Singh
Structural EngineerAkhilesh kumar singh

Land Details

typekhasra_or_plot_noarea_sqmt
Khasra575 KH, 575 GH, 550 KA, 550 KH, 570 KH, 570 KA2292.64

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
Block-1GFOTHER000
Block-112 BHK143.68-
Block-112 BHK143.03-
Block-113 BHK165.06-
Block-113 BHK160.44-
Block-112 BHK151.86-
Block-112 BHK148.44-
Block-112 BHK146.80-
Block-113 BHK187.04-
Block-112 BHK157.04-
Block-112 BHK157.76-
Block-122 BHK145.49-
Block-122 BHK144.08-
Block-123 BHK165.08-
Block-123 BHK163.13-
Block-122 BHK154.22-
Block-122 BHK152.83-
Block-122 BHK150.26-
Block-122 BHK146.17-
Block-122 BHK145.95-
Block-122 BHK160.50-
Block-122 BHK160.15-
Block-132 BHK145.49-
Block-132 BHK144.08-
Block-133 BHK165.08-
Block-133 BHK163.13-
Block-132 BHK154.22-
Block-132 BHK152.83-
Block-132 BHK150.26-
Block-132 BHK146.17-
Block-132 BHK145.95-
Block-132 BHK160.50-
Block-132 BHK160.15-
Block-142 BHK145.49-
Block-142 BHK144.08-
Block-143 BHK165.08-
Block-143 BHK163.13-
Block-142 BHK154.22-
Block-142 BHK152.83-
Block-142 BHK150.26-
Block-142 BHK146.17-
Block-142 BHK145.95-
Block-142 BHK160.50-
Block-142 BHK160.15-
Block-152 BHK145.49-
Block-152 BHK144.08-
Block-153 BHK165.08-
Block-153 BHK163.13-
Block-152 BHK154.22-
Block-152 BHK152.83-
Block-152 BHK150.26-
Block-152 BHK146.17-
Block-152 BHK145.95-
Block-152 BHK160.50-
Block-152 BHK160.15-
Block-162 BHK167.41-
Block-162 BHK152.08-
Block-163 BHK157.33-
Block-162 BHK148.40-
Block-161 BHK141.26-
Block-161 BHK140.08-
Block-163 BHK167.54-
Block-162 BHK152.68-
Block-162 BHK153.31-
Block-172 BHK167.41-
Block-172 BHK152.08-
Block-173 BHK157.33-
Block-172 BHK148.40-
Block-171 BHK141.26-
Block-171 BHK140.08-
Block-173 BHK167.54-
Block-172 BHK152.68-
Block-172 BHK153.31-
SHOPGFSHOP214.230

Development Works

work_namedescription
Road WorkConcrete pavers based road will be created for all internal road works.
FootpathsNot Applicable
Water Supply Including Drinking Water Facilities2 Nos of boring will provide the water supply to the plot & individual. Terrace tanks shall be provided on building terrace for distribution through gravity.
Sewer SystemCentralized sewerage system shall be provided. All sewarge water shall be connect with the municipal sewarge system.
DrainStorm water system shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain line.
ParksSmall Park
Tree PlantingAll around the boundary wall small plants will be provided.
Design For Electric Supply Including Street LightingWe have design the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting,Pump room etc.
Community BuildingsSmall Community hall.
Treatment and Disposal System of Sewage and Sullage waterNot Applicable.
Solid Waste Management And Disposal SystemNot Applicable.
Water Conservation SystemA well designed rain water harvesting system shall be provided for the whole building complex to conserve water
Energy Management System Including Use of Renewable EnergyWe will use LED light fitting in external, Parking etc areas.
Fire Protection And Fire Safety SystemSince the building is less than 45m in height all the fire norms shall be followed as NBC and approval of fire department
Social Infrastructure And Other Public Amenities Including Public Health ServicesNot Applicable.
Emergency Evacuation ServicesNot Applicable.
Other Miscellaneous WorkNot Applicable.

Bank Details

Bank NameAxis Bank
BranchLanka
Branch AddressVaranasi
Account HolderFramework infrabuilds private limited
Account Number914020056637979
IFSC CodeUTIB0000856

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Lucknow

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy