RUDRA SAUBHAGYAM PHASE-1
RUDRA REAL ESTATE PRIVATE LIMITED
Varanasi, Uttar Pradesh
Approved
1st Mar 2021
Completed
31st Dec 2025
Registration No.
UPRERAPRJ970185
Project Type
Residential
District
Varanasi
Taluka
Pindra **
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ970185 |
| Project Status | Completed |
| Project Category | Residential |
| District | Varanasi |
| Taluka | Pindra ** |
| Start Date | 2021-03-01 |
| Completion Date | 2025-12-31 |
| Total Area (sqm) | 5081 |
| Project Cost (Lacs) | 2900 |
| Duration (Months) | 58 |
| Registration Fee | 30500 |
Promoter Details
| Promoter Name | RUDRA REAL ESTATE PRIVATE LIMITED |
| Promoter ID | UPRERAPRM10301 |
| Mobile | 95******** |
Project Team
| role | name |
|---|---|
| Architect | RAJIV BAJPAI |
| Contractor | BB REAL TECH. MR. PRADEEP TYAGI |
| Structural Engineer | MAQSUD E NAZAR. NNC DESIGN INTERNATION |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | Arazi No. 21, Part-22, Part-24, Mauza-Dhanesaari, Paragana- Athganwa, Tehsil-Pindra, District-Varanasi | 13436 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| TOWER-1 | GF | OTHER | 0 | 0 | 0 |
| TOWER-1 | 1 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 1 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 1 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 1 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 1 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 1 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 1 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 1 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 1 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 2 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 2 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 2 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 2 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 2 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 2 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 2 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 2 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 2 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 2 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 3 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 3 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 3 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 3 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 3 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 3 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 3 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 3 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 3 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 3 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 4 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 4 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 4 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 4 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 4 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 4 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 4 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 4 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 4 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 5 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 5 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 5 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 5 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 5 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 5 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 5 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 5 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 5 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 5 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 6 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 6 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 6 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 6 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 6 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 6 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 6 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 6 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 6 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 6 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 7 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 7 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 7 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 7 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 7 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 7 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 7 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 7 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 7 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 7 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 8 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 8 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 8 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 8 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 8 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 8 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 8 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 8 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 8 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 8 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 9 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 9 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 9 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 9 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 9 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 9 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 9 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 9 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 9 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 9 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 10 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 10 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 10 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 10 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 10 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 10 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 10 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 10 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 10 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 10 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 11 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 11 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 11 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 11 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 11 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 11 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 11 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 11 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 11 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 11 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 12 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 12 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 12 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 12 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 12 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 12 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 12 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 12 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 12 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 12 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 13 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 13 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 13 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 13 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 13 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 13 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 13 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 13 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 13 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 13 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 14 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 14 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 14 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 14 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 14 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 14 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 14 | 2 BHK | 1 | 53.64 | - |
| TOWER-1 | 14 | 2 BHK | 1 | 48.34 | - |
| TOWER-1 | 14 | 2 BHK | 1 | 59.55 | - |
| TOWER-1 | 14 | 3 BHK | 1 | 78.79 | - |
| TOWER-1 | 1 | 3 BHK | 1 | 70.19 | - |
| TOWER-1 | 4 | 2 BHK | 1 | 53.64 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | This is the single plot polygon shaped, having total 1 no. of entry gate and 1 no. of exit gate from the 24m wide front road, Site is surrounded by other plots of the farmers from three sides. |
| Boundary Wall | 1.8 - 2.1 m hgh and 200 mm thick Boundary wall designed. Brick Work of 9 inches and rcc work in column and beam may be used as per design. MS Broad entrance and exit gates are developed with boundary. |
| Road Work | Trimix road will be used as per design suggested by the Architect for internal road. |
| Footpaths | All internal roads will have narrow footpath with matt finish tiles pavers or eqivalent finishes. |
| Water Supply Including Drinking Water Facilities | Ground water may also be used. Also end users shall be used their individual RO system as per their requirement. Overhead tanks shall be provided on building terrace for distribution through gravity. |
| Sewer System | Centralized Sewerage system shall be provided. All the Sewerage water shall be go to the STP for treatment after treatment, water shall be recycled and it will use in gardening, flush tanks and vehicle washing, overflow from the STP shall be connect with the Municiple sewerage system in future or a seasonal natural drain running along with the site boundary. |
| Drain | Storm water system shall be provided. Storm water from roads and other landscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting pit for recharge the Ground water and overflow shall be connect with the Municiple drain line. |
| Parks | There are many green/ landscape area in front/ side of building including green parks, play areas for childrens and different recreational activities. |
| Tree Planting | There are different type of tree plantation is proposed at site in order to maintain greenary and natural view. |
| Design For Electric Supply Including Street Lighting | We have designed the system as per the local electricity Board and consider centralized Transformer, HT panel, LT Panel, Feeder Pillar and DG back for common service like External lighting, STP, Pump room etc. |
| Community Buildings | Club Houses/ community centre is provided, swimming poolwith sitting area and garden. |
| Treatment and Disposal System of Sewage and Sullage water | Centralized Sewerage system shall be provided. All sewerage water shall be go to the STP for treatment after treatment, water shall be recycled and it will use in gardening, flush tanks and vehicle washing, overflow from the STP shall be connect with the Municiple sewerage system in future or a seasonal natural drain running along the site boundary. |
| Solid Waste Management And Disposal System | There are a proper garbage collection area provided for the solid waste manangement. |
| Water Conservation System | A well designed rain water harvesting system shall be provided for the whole building complex to conserve water. |
| Energy Management System Including Use of Renewable Energy | We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motors. Terrace will be provided with the Solar Voltaic Panels to provide Renewable source of energy for common areas in building complex. |
| Fire Protection And Fire Safety System | Since the building is less than 45 m in height all the fire norms shall be followed as NBC and approval of fire department. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Sewerage , storm water and water supply system shall be provided. We have proposed common pump room with Primary filteration. Transfer pumps to fill the domestic overhead tank. Water for domestic use Flushing go down through gravity from domestic as well as flushing tanks. All sewerage shall be go to The STP for recycling the water. Storm water for roof, roads and other area shall be connect to the Storm water drain channel and go to the rain water harvesting pit for recharge the Ground water and overflow shall be connect with Municiple drain or a seasonal natural drain running along the site boundary. |
| Emergency Evacuation Services | Fire Staircase is provided in the each building, with the fire resistant doors, basements have 1 (one) accesse and exit in case of emergency. |
| Other Miscellaneous Work | Luxurious entrance lobby in each block, convenience store for day to day small purchasings, lush green shurbs at every vacant space on ground. |
Bank Details
| Bank Name | STATE BANK OF INDIA |
| Branch | SME BRANCH CLUB ROAD VARANASI |
| Branch Address | SME BRANCH CLUB ROAD VARANASI-221002 |
| Account Holder | RREL- SEP. BANK Ac FOR RUDRA SAUBHAGYAM PHASE-I |
| Account Number | 39938628443 |
| IFSC Code | SBIN0009252 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Lucknow


Ask Pulse Ai anything about real estate