Shree Sai City Phase-2
SHREESAIBABA INFRAPROJECT PRIVATE LIMITED
Varanasi, Uttar Pradesh
Approved
1st Oct 2024
Pending
1st Mar 2027
Registration No.
UPRERAPRJ490668/04/2025
Project Type
Residential
District
Varanasi
Taluka
Pindra **
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ490668/04/2025 |
| Project Status | New |
| Project Category | Residential |
| District | Varanasi |
| Taluka | Pindra ** |
| Start Date | 2024-10-01 |
| Completion Date | 2027-03-01 |
| Total Area (sqm) | 5490 |
| Project Cost (Lacs) | 6350 |
| Duration (Months) | 30 |
| Registration Fee | 32500 |
Promoter Details
| Promoter Name | SHREESAIBABA INFRAPROJECT PRIVATE LIMITED |
| Promoter ID | UPRERAPRM11979 |
| Mobile | 94******** |
Project Team
| role | name |
|---|---|
| Architect | Nishant Shekhar |
| Contractor | SSB Housing Pvt. Ltd. |
| Structural Engineer | Diwakar Bhagat |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | 79 and 80 Dasepur, Tehsil Pindra, Varanasi, Uttar Pradesh, PIN- 221001 | 5490 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| Type-1(Block-B) | 1 | 2 BHK | 4 | 56.26 | - |
| Type-1(Block-B) | 2 | 2 BHK | 4 | 56.26 | - |
| Type-1(Block-B) | 3 | 2 BHK | 4 | 56.26 | - |
| Type-1(Block-B) | 4 | 2 BHK | 4 | 56.26 | - |
| Type-1(Block-B) | 5 | 2 BHK | 4 | 56.26 | - |
| Type-1(Block-B) | 6 | 2 BHK | 4 | 56.26 | - |
| Type-1(Block-B) | 7 | 2 BHK | 4 | 56.26 | - |
| Type-1(Block-B) | 8 | 2 BHK | 4 | 56.26 | - |
| Type-1(Block-B) | 9 | 2 BHK | 4 | 56.26 | - |
| Type-1(Block-B) | 10 | 2 BHK | 4 | 56.26 | - |
| Type-1(Block-B) | 11 | 2 BHK | 4 | 56.26 | - |
| Type-1(Block-B) | 12 | 2 BHK | 4 | 56.26 | - |
| Type-1(Block-B) | 13 | 2 BHK | 4 | 56.26 | - |
| Type-1(Block-B) | 14 | 2 BHK | 4 | 56.26 | - |
| Type-1(Block-B) | 15 | 2 BHK | 4 | 56.26 | - |
| Type-1(Block-B) | 16 | 2 BHK | 4 | 56.26 | - |
| Type-2(Block-C) | 1 | 3 BHK | 8 | 75.79 | - |
| Type-2(Block-C) | 2 | 3 BHK | 8 | 75.79 | - |
| Type-2(Block-C) | 3 | 3 BHK | 8 | 75.79 | - |
| Type-2(Block-C) | 4 | 3 BHK | 8 | 75.79 | - |
| Type-2(Block-C) | 5 | 3 BHK | 8 | 75.79 | - |
| Type-2(Block-C) | 6 | 3 BHK | 8 | 75.79 | - |
| Type-2(Block-C) | 7 | 3 BHK | 8 | 75.79 | - |
| Type-2(Block-C) | 8 | 3 BHK | 8 | 75.79 | - |
| Type-2(Block-C) | 9 | 3 BHK | 8 | 75.79 | - |
| Type-2(Block-C) | 10 | 3 BHK | 8 | 75.79 | - |
| Type-2(Block-C) | 11 | 3 BHK | 8 | 75.79 | - |
| Type-2(Block-C) | 12 | 3 BHK | 8 | 75.79 | - |
| Type-2(Block-C) | 13 | 3 BHK | 8 | 75.79 | - |
| Type-2(Block-C) | 14 | 3 BHK | 8 | 75.79 | - |
| Type-2(Block-C) | 15 | 3 BHK | 8 | 75.79 | - |
| Type-2(Block-C) | 16 | 3 BHK | 8 | 75.79 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Yes, Demarcation of the Plots is Completed with Approved Surveyors along with Total Station etc. |
| Boundary Wall | Yes, Boundary Wall with RCC Footings with RCC Column in between Column 230 mm Brickwork and Plaster both the side with Boundary Wall Lights etc. |
| Road Work | Yes, Compacted Earth with Consolidated Subgrade along laying of Water Bound Macadam Two Layers with 115 mm Thick Layer along with RCC Flooring 124(Trimix) Along with Minimum Reinforcement with Construction joints filled with polysulphide Thioflex 600 etc. |
| Footpaths | Yes, Footpath will be constructed using interlocking/ Paver as per Sanctioned Plan. |
| Water Supply Including Drinking Water Facilities | Yes, As per Prescribed norms WTH Adequate Provision for treatment storage distribution network. The Norm laid down by GOI for providing potable water supply shall be ensured. |
| Sewer System | Yes, Proper Sewerage System will be constructed using RCC/ UPVC Pipes as per Drawings and will be Treated with STP. STP Treated Water will be used as mentioned above and residual will be disposed off in Government System. |
| Drain | Yes, Draining System will be constructed using RCC/ UPVC Pipes as per drawings. Drainage System Comprise of Internal Drainage System ultimate Disposal. |
| Parks | Yes, Beautiful Landscape with Civil Work. Parks with Children Playing Equipment using Malaysian TIUFC with Sitting Benches etc. |
| Tree Planting | Yes, Planting along with the Boundary wall and the Internal Roads where ever possible to make the Environment Green and Shady. |
| Design For Electric Supply Including Street Lighting | Yes, Transformers with RMU along with Enerymeters for each Flat, and distribution Board along with Backup power supply using armed cable with necessary Diameters etc. Street Light Single Pole with double light where ever necessary using Led Lights to save the Power Energy along with Seres Connections with main Control. |
| Community Buildings | Yes, Club with All Facilities GYM with all Equipment Indoor Game Rooms etc. |
| Treatment and Disposal System of Sewage and Sullage water | Yes, STP to Treated Sewage Water and after treated to be used for Horticulture and the Flushing System and Solid Waste to be sorted and disposal according to the conditions. |
| Solid Waste Management And Disposal System | Yes, STP and Garbage Storage yards and Garbage Chuit ect. |
| Water Conservation System | Yes, Adequate Number of RWH Pits have been provided. |
| Energy Management System Including Use of Renewable Energy | Yes, Solar Penal and LED Lights shall Extensivily used. |
| Fire Protection And Fire Safety System | Yes, Public Addressing System, Sprinklers in parking and common areas, Fire Hydrant Externally each typical Floor hosereel cabin with Hydrant along with Addressable smoke detector, duly signage each floor and Fire Escaping Staircases , Fire Main Switch in each Lift along with Fire Brigade in the gate with Fire Man Switch etc. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Yes, Social Gathering places like Club , Park Ampetheaters , Children Care, Small First Aid Rooms etc. in community are being provided. |
| Emergency Evacuation Services | Fire Escape Staircases Fire Alarms public Addressing Systems. |
| Other Miscellaneous Work | Proper Security System including Security Guard, CCTV, Cameras and controlled access will be made available. |
Bank Details
| Bank Name | State Bank of India |
| Branch | SPL Commercial Branch, Varanasi |
| Branch Address | Specialized Commercial Branch, Kachahri, SBI Main Branch Campus, Varanasi, Uttar Pradesh, PIN- 221002 |
| Account Holder | Shreesaibaba infra Projects Pvt. Ltd. Collection Account for Shree Sai City Phase-2 |
| Account Number | 43124014639 |
| IFSC Code | SBIN0009252 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in