Tridev Annapurna
Siddhee Vinayak Infrahome Private Limited
Varanasi, Uttar Pradesh
Approved
1st Oct 2013
Completed
31st Mar 2019
Registration No.
UPRERAPRJ5636
Project Type
Residential
District
Varanasi
Taluka
Varanasi
State
Uttar Pradesh
Project Details
| RERA ID | UPRERAPRJ5636 |
| Project Status | Completed |
| Project Category | Residential |
| District | Varanasi |
| Taluka | Varanasi |
| Start Date | 2013-10-01 |
| Completion Date | 2019-03-31 |
| Total Area (sqm) | 2606 |
| Project Cost (Lacs) | 1500 |
| Duration (Months) | 66 |
| Registration Fee | 18500 |
Promoter Details
| Promoter Name | Siddhee Vinayak Infrahome Private Limited |
| Promoter ID | UPRERAPRM10947 |
| Mobile | 87******** |
Project Team
| role | name |
|---|---|
| Architect | Kumar Neeraj |
| Contractor | Surendera Prasad |
| Structural Engineer | Space Consulting Engineers |
Land Details
| type | khasra_or_plot_no | area_sqmt |
|---|---|---|
| Khasra | part 35/2 | 680.72 |
| Khasra | part 49 | 680.72 |
| Khasra | part 50 | 680.72 |
| Khasra | part 51/1 | 680.72 |
Unit Configuration
| Block No | Floor Number | Flat/ Apartment/ Shop/Plot type | Number of Apartment/Flats/Shop | Unit Carpet Area (in sqm) | Open Parking Space (in Nos.) |
|---|---|---|---|---|---|
| 1 | BSMNT | OTHER | 0 | 0 | - |
| 1 | BSMNT2 | OTHER | 0 | 0 | - |
| 1 | BSMNT3 | OTHER | 0 | 0 | - |
| 1 | 1 | 3 BHK | 1 | 97.67 | - |
| 1 | 2 | 3 BHK | 1 | 89.512 | - |
| 1 | 2 | 3 BHK | 1 | 96.326 | - |
| 1 | 2 | 3 BHK | 1 | 116.245 | - |
| 1 | 2 | 3 BHK | 1 | 117.594 | - |
| 1 | 3 | 3 BHK | 1 | 89.512 | - |
| 1 | 3 | 3 BHK | 1 | 97.619 | - |
| 1 | 3 | 3 BHK | 1 | 96.326 | - |
| 1 | 3 | 3 BHK | 1 | 118.833 | - |
| 1 | 4 | 3 BHK | 1 | 89.512 | - |
| 1 | 4 | 3 BHK | 1 | 97.619 | - |
| 1 | 4 | 3 BHK | 1 | 96.326 | - |
| 1 | 4 | 3 BHK | 1 | 118.833 | - |
| 1 | 4 | 3 BHK | 1 | 117.594 | - |
| 1 | 5 | 3 BHK | 1 | 89.512 | - |
| 1 | 5 | 3 BHK | 1 | 97.619 | - |
| 1 | 5 | 3 BHK | 1 | 96.326 | - |
| 1 | 5 | 3 BHK | 1 | 117.594 | - |
| 1 | 6 | 3 BHK | 1 | 89.512 | - |
| 1 | 6 | 3 BHK | 1 | 97.619 | - |
| 1 | 6 | 3 BHK | 1 | 96.326 | - |
| 1 | 6 | 3 BHK | 1 | 117.594 | - |
| 1 | 7 | 3 BHK | 1 | 89.512 | - |
| 1 | 7 | 3 BHK | 1 | 96.326 | - |
| 1 | 7 | 3 BHK | 1 | 118.833 | - |
| 1 | 7 | 3 BHK | 1 | 117.594 | - |
| 1 | 7 | 3 BHK | 1 | 97.619 | - |
| 1 | 8 | 3 BHK | 1 | 89.512 | - |
| 1 | 8 | 3 BHK | 1 | 97.619 | - |
| 1 | 8 | 3 BHK | 1 | 96.326 | - |
| 1 | 8 | 3 BHK | 1 | 118.833 | - |
| 1 | 8 | 3 BHK | 1 | 117.594 | - |
| 1 | 9 | 3 BHK | 1 | 89.512 | - |
| 1 | 9 | 3 BHK | 1 | 97.619 | - |
| 1 | 9 | 3 BHK | 1 | 96.326 | - |
| 1 | 9 | 3 BHK | 1 | 118.833 | - |
| 1 | 9 | 3 BHK | 1 | 117.594 | - |
| 1 | 10 | 3 BHK | 1 | 89.512 | - |
| 1 | 10 | 3 BHK | 1 | 97.619 | - |
| 1 | 10 | 3 BHK | 1 | 96.326 | - |
| 1 | 10 | 3 BHK | 1 | 118.833 | - |
| 1 | 10 | 3 BHK | 1 | 117.594 | - |
| 1 | GF | SHOP | 1 | 33.4 | 0 |
| 1 | GF | SHOP | 1 | 33.4 | 0 |
| 1 | GF | SHOP | 1 | 33.36 | 0 |
| 1 | GF | SHOP | 1 | 111.5 | 0 |
| 1 | GF | SHOP | 1 | 27.2 | 0 |
| 1 | 1 | SHOP | 1 | 33.74 | - |
| 1 | 1 | SHOP | 2 | 33.7 | - |
| 1 | 1 | SHOP | 1 | 112 | - |
| 1 | 1 | SHOP | 1 | 27.3 | - |
| 1 | 1 | 3 BHK | 1 | 89.47 | - |
| 1 | 1 | 3 BHK | 1 | 103.77 | - |
| 1 | 3 | 3 BHK | 1 | 117.56 | - |
| 1 | 5 | 3 BHK | 1 | 118.8 | - |
| 1 | 5 | 3 BHK | 1 | 117.5 | - |
| 1 | 6 | 3 BHK | 1 | 118.8 | - |
| 1 | 7 | 3 BHK | 1 | 97.61 | - |
| 1 | 2 | 3 BHK | 1 | 97.6 | - |
Development Works
| work_name | description |
|---|---|
| Demarcation of Plots | Plot line demarcarted |
| Boundary Wall | 2.1m. Heigh boundary wall composed of 230mm thick brickwork and RCC columns @ 4.0m. C/c along with plinth beam. The wall to be finished with plaster & paint.main gate//guard room/entry checking |
| Road Work | Concrete road |
| Footpaths | 1.5m. Wide footpath with interlocking pavers along driveway & in green areas as/landscape design. |
| Water Supply Including Drinking Water Facilities | Source of water would be bore well water after. Water will be first stored in overhead tank and fed to individual units thru gravity system. |
| Sewer System | Sewage to be collected thru drains & will disposed in municipal sevar line. |
| Drain | Proper drainage system planned for both sewage & storm. Storm water is connected to rain water harvesting pits. All drainage below gravity lvl. Would be connected & drained into a sump & then pumped into the storm drain. |
| Parks | To be develop as applicable. |
| Tree Planting | Adequate no. Of plantation in the form of trees, shrubs, plants will be provided. |
| Design For Electric Supply Including Street Lighting | We have design the system as per local electricity board and consider centralized Transformer , panel Feeder pillar and DG back for common service like external lighting , pump room comman passage etc. |
| Community Buildings | Not applicable. |
| Treatment and Disposal System of Sewage and Sullage water | Centalized sewerage system shall be provided . All sewerage water should be collected through drain & will connect with the municiple sewerage system. |
| Solid Waste Management And Disposal System | As per requirement. |
| Water Conservation System | Proper sanitary fixtures with ISI mark and rated for water saving to be used. Rain water harvesting pits to be used for ground water recharge. |
| Energy Management System Including Use of Renewable Energy | We will use LED lights fitting in external area & all the equipment shall have energy efficient motor. |
| Fire Protection And Fire Safety System | All arrangements as per NBC shall be provided. |
| Social Infrastructure And Other Public Amenities Including Public Health Services | Following social infrastructure and public amenities will be provided: ? Power Back-up in common areas. ? round-the-clock security features, including CCTV surveillance systems, firefighting equipment and intercom facility |
| Emergency Evacuation Services | Fire evacuation plans to be installed in common areas |
| Other Miscellaneous Work | Not applicable. |
Bank Details
| Bank Name | HDFC BANK |
| Branch | LANKA BRANCH |
| Branch Address | D-30/2, A-1, GANGA BAGH COLONY, MADAN MOHAN MALVIYA MARG, LANKA, VARANASI |
| Account Holder | SID VIN INFRAHOME P L TRIDEV AN MS CO AC |
| Account Number | 50200059425342 |
| IFSC Code | HDFC0001465 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Kanpur


Ask Pulse Ai anything about real estate





