TRIDEV RESIDENCY

ANJANI REALTORS

Varanasi, Uttar Pradesh

RERA approved

Approved

31st Dec 2013

Project completed

Completed

16th Jul 2021

Registration No.

UPRERAPRJ5701

Project Type

Residential

District

Varanasi

Taluka

Varanasi

State

Uttar Pradesh

Project Details

RERA IDUPRERAPRJ5701
Project StatusCompleted
Project CategoryResidential
DistrictVaranasi
TalukaVaranasi
Start Date2013-12-31
Completion Date2021-07-16
Total Area (sqm)6746
Project Cost (Lacs)2950
Duration (Months)91
Registration Fee39000

Promoter Details

Promoter NameANJANI REALTORS
Promoter IDUPRERAPRM11168
Mobile87********

Project Team

rolename
ArchitectKapoor & Associates
ContractorSurendera Prasad
Structural EngineerSanjeev Gupta

Land Details

typekhasra_or_plot_noarea_sqmt
Khasrapart of 38/1445
Khasrapart of 32 & 33/1505
Khasrapart of 32 & 33/1783
Khasrapart of 35,36,37 & 38/2422
Khasrapart of 35,36,37 & 38/2422
Khasrapart of 35,36,37 & 38/24217

Unit Configuration

Block NoFloor NumberFlat/ Apartment/ Shop/Plot typeNumber of Apartment/Flats/ShopUnit Carpet Area (in sqm)Open Parking Space (in Nos.)
1BSMNTOTHER00-
1BSMNT2OTHER00-
1BSMNT3OTHER00-
1GF3 BHK185.030
1GF3 BHK184.10
1GF3 BHK186.10
1GF3 BHK185.870
1GF2 BHK182.990
1GF2 BHK170.910
1GF2 BHK174.160
1GF2 BHK171.740
113 BHK185.03-
113 BHK184.10-
113 BHK186.15-
113 BHK185.87-
112 BHK182.99-
112 BHK170.91-
112 BHK174.16-
112 BHK171.74-
123 BHK185.03-
123 BHK184.10-
123 BHK186.15-
123 BHK185.87-
122 BHK182.99-
122 BHK170.91-
122 BHK174.16-
122 BHK171.74-
133 BHK185.03-
133 BHK184.10-
133 BHK186.15-
133 BHK185.87-
132 BHK182.99-
132 BHK170.91-
132 BHK174.16-
132 BHK171.74-
143 BHK185.03-
143 BHK184.10-
143 BHK186.15-
143 BHK185.87-
142 BHK182.99-
142 BHK170.91-
142 BHK174.16-
142 BHK171.74-
153 BHK185.03-
153 BHK184.10-
153 BHK186.15-
153 BHK185.87-
152 BHK182.99-
152 BHK170.91-
152 BHK174.16-
152 BHK171.74-
163 BHK185.03-
163 BHK184.1-
163 BHK186.15-
163 BHK185.87-
162 BHK182.99-
162 BHK170.91-
162 BHK174.16-
162 BHK171.74-
2BSMNTOTHER00-
2BSMNT2OTHER00-
2BSMNT3OTHER00-
2GF3 BHK185.030
2GF3 BHK184.100
2GF3 BHK186.150
2GF3 BHK185.870
2GF2 BHK182.990
2GF2 BHK170.910
2GF2 BHK174.160
2GF2 BHK171.740
213 BHK185.03-
213 BHK184.10-
213 BHK186.15-
213 BHK185.87-
212 BHK182.99-
212 BHK170.91-
212 BHK174.16-
212 BHK171.74-
223 BHK185.03-
223 BHK184.10-
223 BHK186.15-
223 BHK185.87-
222 BHK182.99-
222 BHK170.91-
222 BHK174.16-
222 BHK171.74-
233 BHK185.03-
233 BHK184.10-
233 BHK186.15-
233 BHK185.87-
232 BHK182.99-
232 BHK170.91-
232 BHK174.16-
232 BHK171.74-
243 BHK185.03-
243 BHK184.10-
243 BHK186.05-
243 BHK185.87-
242 BHK182.99-
242 BHK170.91-
242 BHK174.16-
242 BHK171.74-
253 BHK185.03-
253 BHK184.10-
253 BHK186.15-
253 BHK185.87-
252 BHK182.99-
252 BHK170.91-
252 BHK174.16-
252 BHK171.74-
263 BHK185.03-
263 BHK184.10-
263 BHK186.15-
263 BHK185.87-
262 BHK182.99-
262 BHK170.91-
262 BHK174.16-
262 BHK171.74-
3BSMNTOTHER00-
3BSMNT2OTHER00-
3BSMNT3OTHER00-
3GF3 BHK180.940
3GF3 BHK199.800
3GF3 BHK188.470
3GF3 BHK190.860
3GF2 BHK169.260
313 BHK180.94-
313 BHK199.80-
313 BHK188.47-
313 BHK190.86-
312 BHK169.26-
312 BHK176.11-
323 BHK180.94-
323 BHK199.80-
323 BHK188.47-
323 BHK190.86-
322 BHK169.26-
322 BHK176.11-
3GF2 BHK176.110
333 BHK180.94-
333 BHK199.8-
333 BHK188.47-
333 BHK190.86-
332 BHK169.26-
332 BHK176.11-
343 BHK180.94-
343 BHK199.8-
343 BHK188.47-
343 BHK190.86-
342 BHK169.26-
342 BHK176.11-
353 BHK180.94-
353 BHK199.80-
353 BHK188.47-
353 BHK190.86-
352 BHK169.26-
352 BHK176.11-
363 BHK180.94-
363 BHK199.80-
363 BHK188.47-
363 BHK190.86-
362 BHK169.26-
362 BHK176.11-

Development Works

work_namedescription
Demarcation of PlotsThis is single plot having 1 nos of entry gates on main road and 1 no. gate on side road. Site is having road on two sides Site is surrounded by other plots on other sides
Boundary Wall1.80 high boundary wall comprising of rcc columns and beams with brick infill walls shall be provided.
Road WorkSetbacks between blocks shall be provided with cement concrete / concrete pavers for easy movement of vehicular and pedestrian traffic
FootpathsSeparate footpaths are not provided. Paver block roads will also act as footpaths.
Water Supply Including Drinking Water FacilitiesDeep borewell shall be used to provide water supply to individual blocks Overhead tanks shall be provided on each building terrace for distribution through gravity. Individual flat owners will install their own RO system.
Sewer SystemCentralized Sewerage system shall be Provided. Provision shall be made for Septic Tank and Soak Pit.Disposal from Soak Pit shall be made in drain
DrainStorm water drain shall be provided which shall connect to the main drain
ParksGreen areas will be provided in the site for recreational purposes
Tree Planting"There will be different types of trees povided in site based on local conditions like ashoka etc. "
Design For Electric Supply Including Street LightingWe have design the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back up for common service like External lighting,,Pump room Lift etc.
Community BuildingsCommunity activity area shall be provided
Treatment and Disposal System of Sewage and Sullage waterCentralized Sewerage system shall be Provided. All Sewerage water shall be go to the Sewer system on the main road
Solid Waste Management And Disposal System"There will be a proper garbage collection area provided for the solid waste management."
Water Conservation SystemA well designed rain water harvesting system shall be provided for the whole building complex to conserve water
Energy Management System Including Use of Renewable EnergyWe will use LED lights fitting in external area and in Lift and Pump room all the equipment shall have energy efficient motor.
Fire Protection And Fire Safety SystemAll the fire norms shall be followed as per approval of fire department
Social Infrastructure And Other Public Amenities Including Public Health ServicesSewerage ,Storm water and water supply system shall be Provided. Rain water harvesting system shall be provided.Community Hall will be provided
Emergency Evacuation ServicesBalcony will be used for evacuation wherever necessary.Assembly points areas will be demarcated for earthquake and other possible disasters
Other Miscellaneous WorkNA

Bank Details

Bank NameHDFC BANK
BranchLANKA BRANCH
Branch AddressD-30/2, A-1, GANGA BAGH COLONY, MADAN MOHAN MALVIYA MARG, LANKA, VARANASI
Account HolderANJANI REALTORS TRIDEV RESIDENCY MS C AC
Account Number50200060923257
IFSC CodeHDFC0001465

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Kanpur

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy